3)
Results of visual inspection of the building to determine location and condition of
asbestos materials; and
4)
Presentation of sampling strategy that will yield statistically viable conclusion on
the extent of asbestos present.
b. Provide name and location of qualified laboratory for sample analysis, which P.I.H.
intends to utilize.
3.
AUTOMATIC TRANSPORT
If changes are required, provide transport narrative with recommendations for improving
the existing automatic transport systems (ATS) and a traffic study that include existing and
proposed ATS with alternate methods of distribution, if feasible.
4.
CRITICAL PATH METHOD (CPM)
Submit the following including VA comments from previous phasing meetings and
Schematics 1 review:
a. Phasing Narrative;
b. Phasing Plans (on reduced site plans);
c. Phasing Diagram;
d. Phases marked on all full size drawings submitted for VA review; and
e. Written list of systems, including temporary system by phase, and separated by
technical discipline.
5.
ELECTRICAL
a. Based on required changes, submit a narrative describing the design, including basic
assumptions and necessary changes to the existing electrical systems. Provide a full
description of the impact of seismic correction to the existing electrical distribution system.
Where new construction is required, include current demand loading (high voltage
switchgear and primary feeder) and projected load of new construction. Propose various
feasible electrical systems for the project and provide advantages/disadvantages for each.
b. Show location and sizes of electrical equipment rooms and electrical, telephone, and
signal closets on drawings. Show all electrical distribution equipment at scale. Include
means and clearances for installation, maintenance and removal/replacement of
equipment.
c. Provide a sheet for symbols, lighting fixture schedules, notes and abbreviations if
required.
d. Submit a plot plan showing existing and proposed electrical underground power,
telephone, and signal inter-building systems (F/A, CCTV, MATV, radio, security, etc.)
associated with the new construction or if modification to the existing system is required.
Program Guide, PG-18-15, Volume F
Schematics
Page 14
June 2006