III. DISTRIBUTION OF A/E MATERIAL
A.
SYMBOL IDENTIFICATION OF CONTRACT DRAWINGS
AS
-
Architectural Drawings (Numbered Only)
HA
-
Asbestos Removal Drawings
BI
-
Boring Log Drawings
ES
-
Electrical Drawings
FA
-
Fire Protection Drawings
MH
-
Heating, Ventilating, and Air Conditioning Drawings
PL
-
Plumbing Drawings
GS
-
Site Development and Environmental Drawings
CU
-
Sanitary and Irrigation Drawings
MU
-
Steam Distribution Drawings
MP
-
Steam Generation Drawings
SS
-
Structural Drawings
B.
GENERAL NOTES
1. Bond prints shall be full-sized.
2. Bind all drawings into sets in the order of their above classification symbol.
3. All submitted specifications shall be original, unbound, and marked-up VA
Master Specifications. Where no VA Master Specification is available, submit
a developed specification.
4. Submit all materials, packaged and clearly marked by discipline, to the
VA's Contracting Officer. However, where a small amount of material is
submitted, the drawings may be packaged together for all disciplines as long
as the drawings are separated and tagged with the discipline name. Other
material may also be consolidated provided they are labeled and can easily
be identified and separated.
5. Material provided unbound will be returned to the A/E. All resubmission
costs will be the responsibility of the A/E
Program Guide, PG-18-15, Volume C
43
May 2006