c. Arrange to have tests performed on soil conditions related to classification of
underground factory-fabricated pre-engineered systems, if that type of system
will be utilized.
18. STEAM GENERATION
a. Provide a report with the following information as a minimum:
1) Combined new (estimated) and existing steam loads including maximum
and minimum summer and winter demands and total annual production.
Provide break-down of new steam loads into categories of end use such as
building heating, humidification, reheat, domestic hot water, sterilization, line
losses, kitchen, and laundry;
2) Life-cycle cost analysis of the steam supply alternatives including fuel
selection. Include analysis of alternative plant locations. Compare the
alternatives, present test results on existing equipment and systems (if
applicable), evaluate all other relevant issues, and make recommendations.;
3) Life-cycle cost analysis for alternatives on types of equipment to be
applied and for heat-recovery alternatives;
4) Data on emissions regulations and the methods for compliance; and
5) Initial selection of major equipment and preliminary calculations of
equipment sizing.
b. Provide the following drawings:
1) Plot plan showing alternative new plant locations and location of existing
plant; and
2) Plan view layouts of alternatives for new plant or modification to existing
plant showing location of equipment and personnel facilities.
19. STRUCTURAL
a. Submit drawings showing three alternative structural systems for typical
bays and supporting calculations. (When only one structural system is possible due
to other project requirements, an explanatory statement may be included and only
that structural system need be submitted.) Submit engineering cost estimates for
each system, including foundation and fireproofing costs. Access the economics of
each structural system with due consideration of the system's effect on the entire
building assembly and recommend a preferred system.
b. Show columns and shear load resisting elements. Indicate existing utilities
and structures within, adjacent, or contiguous to the new construction.
Program Guide, PG-18-15, Volume B
Schematics 2
May 2006
Page 21