e. With these surveys as a base, submit proposed building locations,
demolition, proposed roads, parking, entrances and exits, and all mechanical and
electrical components on grade. Consider function, aesthetics, and the environment
when locating all features.
f. Submit grading plans of all proposed construction. Show spot grades at
structure corners, entrances, intersections, etc. Provide first floor elevations for
structures and equipment pads.
g. Show erosion control and drainage, staging areas, construction access and
parking, and stockpile areas for earth and materials.
h. Submit landscape drawings showing plant groupings and a list of proposed
plant materials. The plants selected must be native to the site climatic zone.
i.
Delineate irrigation limits.
15. SPACE PLANNING
Update and expand the Space-Accounting Summary Table. In addition to the
data required at S1, provide columns for Designed Net Area and Variance From
Approved Space Program Net Area for each department or service. Also, list
separately the area required for additions to the program, unassigned space, major
circulation (inter-departmental corridors, stairs, elevators), major mechanical and
electrical spaces, exterior walls, connecting corridors to other buildings, space for
future mechanical system expansion, and similar special requirements.
16. SPECIFICATIONS
No submission is required.
17. STEAM DISTRIBUTION (OUTSIDE)
a. Provide a report with the following information as a minimum:
1) Estimate of steam and condensate loads which will be imposed on new
or existing distribution facilities;
2) Life-cycle cost analysis for alternative types of steam distribution
systems and alternative routings of the systems. Analyze the test results on
existing systems (if applicable). Evaluate the alternatives, consider all other
relevant issues, and make recommendations; and
3) Calculations of pipe sizing.
b. Provide plot plans of new steam distribution systems and existing systems
affected by the project. Utilize site survey to determine the location of other
utilities along the proposed routes.
Program Guide, PG-18-15, Volume B
Schematics 2
Page 20