Format a
A/E's ESTIMATE OF ADJUSTMENT IN CONTRACT AMOUNT - SUMMARY
ESTIMATED TIME IN MANHOURS
WORK CATEGORIES
Supervisor
Designer
Draftsman
Other (Specify)
(1)
(2)
(3)
(4)
(5)
(6)
(7)
Drawings (Data from Format b)
Design Calculations: Structural
Electrical
Mechanical
Selection of Equipment
Revision of Equipment
Architectural Structural Specification
Section Nos.
Mechanical-Electrical Specification
Section Nos.
Construction Time Duties
Cost Estimating
TOTAL
TOTAL COST BREAKDOWN
1. Supervisor _________hrs. @ $________/hr.
$___________
2. Designer
_________hrs. @ $________/hr.
$___________
3. Draftsman _________hrs. @ $________/hr.
$___________
4. Other
_________hrs. @ $________/hr.
$___________
5. Other
_________hrs. @ $________/hr.
$___________
6. Other
_________hrs. @ $________/hr.
$___________
7. Total Design Costs (Lines 1 thru 6)
$______________
8. Overhead & Profit @__________% (Of line 7)
$___________
9. Total (Lines 7 and 8)
$______________
10. Blueprinting 1/
$___________
11. Special Reproduction and Binding 1/
$___________
12. Travel 1/
$___________
13. Additional Item (Specify) _________________
$___________
14. Additional Item (Specify) _________________
$___________
15. GRAND TOTAL (Lines 9 thru 14)
$______________
1/ Use additional blank sheets to explain blueprinting charges, specification reproduction and binding charges,
travel charges, etc., and other categories of work requiring explanation.