Department of Veterans Affairs
Program Guide PG-18-14
Office of Facilities Management
Chapter - 270
December 2004
ROOM FINISHES, DOOR AND HARDWARE SCHEDULE
Service Physical Medicine and Rehabilitation
ROOM OR SPACE
DOORS
HARDWARE
FLOOR
BASE
WALLS
WAIN
CEILING
DOOR
H.W.NO.
SYMBOL
Administration:
Chief of Service
CP
RB
GWB-W
AT
1/2 S
52
Staff Physician
CP
RB
GWB/W
AT
1/2 S
23
Secretary & Waiting
CP
RB
GWB/W
AT
1/2 S-T
23
Assistant Chief
CP
RB
GWB/W
AT
1/2 S
23
Coordinator
Staff Lockers,
See Chapter 410
Lounges, Toilets, and
Showers
Escort Service
VCT/CP
RB
GWB/W
AT
1/2 S-T
23
Education:
Office Resident
CP
RB
GWB
AT
1/2 S
23
Physician
Study Cubicles
CP
RB
GWB
AT
Open
AT1
Conference/Classroom
1/2 U-T
40
CP
RB
GWB/W
1,2
for Residents and
Students
Clinical:
GWB1
1/2 V3
Exam Room
VCT
RB
AT
52
GWB4
1/2 V-T3
Electromyography (EMG)
VCT
RB
AT
53
Room
Physical Therapy:
Clinic Office
VCT/CP
RB
GWB/W
AT
3/4 S-T
23
1/2 W3
69
Hubbard Tanks
CT
CT
CT
PCP
1/2 V3
Arm and Leg Whirlpool
CT
CT
CT
PCP
69
Wheelchair Toilet
CT
CT
CT
GWB
1/2 S
14
1/2 V-T3
Treatment Clinic
VCT
RB
GWB
AT
53
1
See Design and Construction Procedures PG-18-3, Topic 11, "Noise Transmission Control".
2
Provide acoustical/tackable wall fabric on one wall.
3
Use X door where VAMC includes SCI unit.
4
See Architectural Design Manual PG-18-10, Chapter 5, "Electromagnetic Shielding".
97