Department of Veterans Affairs
Program Guide PG-18-14
Office of Facilities Management
Chapter - 268
December 2004
ROOM FINISHES, DOOR AND HARDWARE SCHEDULE
Service - Pharmacy
ROOM OR SPACE
DOORS
HARDWARE
FLOOR
BASE
WALLS
WAIN
CEILING
DOOR
H.W.NO.
SYMBOL
Inventory Control/
VCT/CP
RB
GWB
AT
Stock Management Clerk
Storage, Prosthetic
VCT
RB
GWB
AT
11/12 V-W
157
and Medical Supplies
GWB1
AT1Lay-i
1/2 S
45
Consultation Room
CP
RB
n Panels
in Grid1
Waiting Area
CP
RB
GWB
AT
Open
---
Specialized Programs Education:
Office, Clinical
CP
RB
GWB
AT
1/2 S
23
Pharmacy Teaching
Coordinator
Pharmaceutical
CP
RB
GWB
AT
1/2 V-T
13
Experimentation
Laboratory
AT1
GWB1,2
Conference/Classroom
CP
RB
1/2 U-T
52
Drug Information
VCT/CP
RB
GWB
AT
1/2 S-T
52
Service
Study Cubicle
Prefabricated
Radiopharmacy
See Chapter 252
Drug Dependency Treatment Clinic:
Prepackaging
VCT/CP
RB
GWB
AT
---
Receiving and Storage
VCT/CP
RB
GWB
AT
36 V
157
Record Control
VCT/CP
RB
GWB
AT
---
GWB1
1/2 S
45
Consultation Room
CP
RB
AT/GWB
Lay-in
Panels
in Grid1
Administrative Work
CP
RB
GWB
AT
1/2 S-T/
52
Area
Open
Storage,
VCT
RB
GWB
AT
11/12 V-W
43
1
See Design and Construction Procedures PG-18-3, Topic 11, "Noise Transmission Control".
2
Provide acoustical/ tackable wall fabric on one wall.
92