Department of Veterans Affairs
Program Guide PG-18-14
Office of Facilities Management
Chapter - 268
December 2004
ROOM FINISHES, DOOR AND HARDWARE SCHEDULE
Service - Pharmacy
ROOM OR SPACE
DOORS
HARDWARE
FLOOR
BASE
WALLS
WAIN
CEILING
DOOR
H.W.NO.
SYMBOL
Stat Counter
VCT/CP
RB
GWB
AT
---
Intravenous Admixture
CT
CT
GWB
AT (SP)
1/2 V-T
67
and Aseptic Transfer
Room
Freezer Space
Prefabricated
Storage Sterile Fluids
VCT
RB
GWB
AT
11/12 V-W
45
and Admixture Sets
Refrigeration/ Freezer
Prefabricated
Area
Storage, Active
VCT
RB
GWB
AT
---
Storage, Cart
VCT
RB
GWB
AT
---
Storage, Poison
VCT
RB
GWB
AT
---
Control
Outpatient Pharmacy:1
GWB1
Prescription Receiving
CP
RB
AT
36 V
157
Filing and Assembly
CP
RB
GWB
AT
Open
GWB1
Dispensing
CP
RB
AT
Open
Active Storage
CP
RB
GWB
AT
Open
Prepackaging
CP
RB
GWB
AT
GWB1
GWB1
Controlled Substances
30 U
157
VCT
RB
Storage and Secured
Dispensing Area1
Storage, Flammable
VCT
RB
GWB
AT
11/12 S
157
Extemporaneous
VCT/CP
RB
GWB
AT
36 S
157
Compounding
Mail Out
VCT/CP
RB
GWB
AT
36 U
157
Refrigeration/ Freezer
Prefabricated Unit
Area
Drug Receiving:
GWB1
AT1
36 V
157
Breakdown and
VCT/CP
RB
Verification Area
1
See Design and Construction Procedures PG-18-3, Topic 14, "Physical Security Requirements
and Options".
91