Department of Veterans Affairs
Program Guide PG-18-14
Office of Facilities Management
Chapter - 232
December 2004
ROOM FINISHES, DOOR AND HARDWARE SCHEDULE
Service - ENT (Ear, Nose, and Throat)
ROOM OR SPACE
DOORS
HARDWARE
FLOOR
BASE
WALLS
WAINS
CEILING
DOOR
H.W.NO.
SYMBOL
GWB1
Examination Treatment
VCT
RB
AT/GWB
1/2 V
52
Rooms
Lay-in
Panels
Reception/Clerk/
CP
RB
GWB-W
AT
1/2 S-T/
23
Files
Open
Patients Waiting
CP
RB
GWB-W
AT
Open
Physician's Office
CP
RB
GWB-W
AT
1/2 S
23
Resident's Office
CP
RB
GWB-W
AT
1/2 S
23
Prefabricated2
Audiometry Room and
Test Alcove
Test Alcove
VCT
RB
GWB-W
AT
Sterilization/
VCT
RB
GWB
AT
1/2 U/T
Preparation and
Storage Room
63
Corridor
VCT
RB
GWB
AT
1/2 VV-T
1
Design and Construction Procedures PG-18-3, Topic 11, "Noise Transmission Control".
2
See Design and Construction Procedures PG-18-3, Topic 6, "Floor Slab Depressions".
3
See Section II, "Doors and Hardware".
55