Department of Veterans Affairs
Program Guide PG-18-14
Office of Facilities Management
Chapter - 224
December 2004
ROOM FINISHES, DOOR AND HARDWARE SCHEDULE
Service - Dietetic Service
ROOM OR SPACE
DOORS
HARDWARE
FLOOR
BASE
WALLS
WAINS
CEILING
DOOR
H.W.NO.
SYMBOL
Special1
Refrigerated
QT
QT
Garbage Storage and
Trash
Cleaning Equipment
QT
QT
CT
AT (SP)
2 SS-T
82
Facilities
Food Processing and
QT
QT
CT
AT (SP)
Preparation
Nourishment
QT
QT
CT
AT (SP)
3/4 V-T or
4
Preparation
Open
Ingredient Control
QT
QT
CT
AT (SP)
3/4 V-T
4
Area
Housekeeping Aids
QT
QT
CT
AT (SP)
1/2 T
13
Closet
Food Storage Area
QT
QT
GWB
AT
1/2 V-T
69
Receiving Area
VCT
RB
GWB or
AT
Automatic
CMU
Roll-up
9'0" x
(SC)
10'0"2
Nonfood Storage
VCT
RB
GWB or
AT
1/2 V-T
69
CMU
(SC)
Sanitation Supply
QT
QT
GWB or
AT
1/2 V-T
69
Storage
CMU
(SC)
Special31
Refrigerated and
Frozen Storage,
(Preprocessing)
CP
RB
GWB
AT
1/2 V-T
52
Corridor
VCT
RB
GWB
CT
AT
1/2 VV-T
82
5'0"
1
Prefabricated, walk-in refrigerator with finished floor flush with adjoining floor.
See Design and Construction Procedures PG-18-3, Topic 6, "Floor Slab Depressions".
2
See Standard Details PG-18-4.
51