Department of Veterans Affairs
Program Guide PG-18-14
Office of Facilities Management
Chapter - 240
December 2004
ROOM FINISHES, DOOR AND HARDWARE SCHEDULE
Service Pathology and Laboratory Medicine
ROOM OR SPACE
DOORS
HARDWARE
FLOOR
BASE
WALLS
WAIN
CEILING
DOOR
H.W.NO.
SYMBOL
Administrative:
Chief Lab Service
VCT
RB
GWB
AT
1/2 S-T
23
Office and
Microscope Area
Staff Pathologist
VCT
RB
GWB
AT
1/2 S-T
23
Office and
Microscope Area
Secretary to Chief
VCT
RB
GWB
AT
1/2 S-T
23
Office, Clerk,
VCT
RB
GWB
AT
1/2 S-T
23
Steno/ Receptionist
Office, Admin.
VCT
RB
GWB
AT
1/2 S-T
23
Assistant
Office, Chief
VCT
RB
GWB
AT
1/2 S-T
23
Medical Technologist
Office, Clinical
VCT
RB
GWB
AT
1/2 S-T
23
Laboratory Scientist
Education Area:
Pathology Resident,
VCT
RB
GWB
AT
1/2 S-T
23
Office and
Microscope Area
Medical Tech. Program:
Office, Education
VCT/CP
RB
GWB
AT
1/2 S-T
23
Coordinator
Student Lab/Class
VCT
RB
GWB
AT
1/2 V-T
23
Room
AT/GWB1
Student Study
CP
RB
Prefab
Cubicle
Lay-in
Panels
in Grid
GWB1,2
Conference Room
CP
RB
AT
1/2 V-T
40
Laboratory Work Areas:
Specimen
VCT
RB
GWB
AT (SP)
1/2 V-T
67
Accessioning,
Processing, and
Distribution Room
1
Provide acoustical/tackable surface on one wall.
2
See Design and Construction Procedures PG-18-3, Topic 11, "Noise Transmission Control".
59