Department of Veterans Affairs
Program Guide PG-18-14
Office of Facilities Management
Chapter - 230
December 2004
ROOM FINISHES, DOOR AND HARDWARE SCHEDULE
Service - Engineering
ROOM OR SPACE
DOORS
HARDWARE
FLOOR
BASE
WALLS
WAINS
CEILING
DOOR
H.W.NO.
SYMBOL
C1
Machine Shop
CMU
AT
1/2 SS-T
82
C1
CMU
AT
1/2 SS-T
82
Mason Shop
Grounds Maintenance
C
CMU
EXP
Int. 11/12
62
Center
U-W, Ext.
1/2 SS-T
82
C1
Locksmith Shop
CMU
AT
1/2 V-T
52
Housekeeping Aids
CT
CT
GWB
CT
AT(SP)
1/2 T
13
Closet
or
4'0"
CMU
(SC)
GWB2
Engineering Control
VCT
RB
AT
1/2 U-T
45
Center
63
C1
Corridor
RB
CMU
AT
1/2 VV-T
or
GWB
1
These floors shall be finished with a colored hardener (non-slip).
2
Design and Construction Procedures PG-18-3, Topic 11, "Noise Transmission Control".
3
See Section II, "Doors and Hardware".
54