JULY 05
SOLICITATION FOR OFFERS
OUTPATIENT CLINIC
SFO NO. V101-183R-xxx-xxx-xx
[INSERT LOCATION OF FACILITY]
Exceptions: Hardware sets for the following conditions and door openings must be properly selected
by a Hardware Consultant from the appropriate hardware sets listed in MCS 08710 or new sets must
be developed to suit the project conditions and door openings.
Communicating Doors: Generally, for doors in partitions that separate offices, specify hardware
set HW 7 where no security is necessary, or a set with a lock if security is needed.
Doors in Fire Partitions: Generally, the hardware sets listed under the column heading
occur, substitute a hardware set which corresponds to the set listed in this handbook for the
space, but is self-closing and self-latching.
In cases where it is important for a fire door to remain open under normal conditions, select a
hardware set that has a combination electro-magnetic closer-holder instead of a closer only.
Electro-magnetic closer-holders must be connected to the fire alarm system.
Lead Lined Doors: Coordinate the hardware sets with the lead lined door and frame details shown
on the Standard Detail drawings and the project drawings.
//Existing Doors or Frames to Remain in Place: Select and coordinate the hardware requirements
for these conditions to insure that suitable/compatible hardware is provided for the intended use of
the space.//
1.4 CEILING HEIGHTS
Minimum clear ceiling heights from finished floor to finished ceiling shall be 9'-0" except for areas listed
below.
Editing Note: delete rooms or areas not required in project.
Camera rooms (Medical Media Production) ......................................10'-0"
Cardiac catheterization rooms (X-ray) ............................................... 9'-6"***
Corrective therapy rooms (Rehabilitation Medicine) .........................10'-0"
Corridors ............................................................................................. 8'-0"
Emergency generator rooms, generators smaller than 500 KW ......12'-0"
Emergency generator rooms, generators 500 KW and larger ..........14'-0"
Libraries (health science and patients) .............................................. 9'-6"
Vocational Rehabilitation Therapy ..................................................... 9'-6"
Mechanical equipment rooms-ceiling heights shall accommodate the equipment and associated
piping, ducts and conduits.
Nuclear Medicine Pet/Cyclotron rooms .............................................10'-0"
Operating rooms ................................................................................. 9'-6"*
Parking structures-minimum clearance ............................................. 7'-6'**
Physical therapy clinics (Rehabilitation Medicine)............................. 9'-6"
Radiation therapy rooms .................................................................... 9'-6"
Switchgear rooms (high voltage) .......................................................11'-0"
Transformer rooms .............................................................................11'-0"
Warehouses........................................................................................15'-0"
X-ray rooms ........................................................................................ 9'-6"***
Part V Schedule C Page 7 of 11
Lessor __________ Gov't. __________