JULY 2005
SOLICITATION FOR OFFERS
OUTPATIENT CLINIC
SFO NO. V101-183R-xxx-xxx-xx
[INSERT LOCATION OF FACILITY]
Editing Note: The following paragraph will apply if VA
has not obtained an assignable option on the site.
//Provide documentation proving evidence of ownership or control of the site. Ownership or control must,
at a minimum, be retained until the Government makes an award. Documentation that constitutes
evidence of control includes, but is not limited to:
An Option To Purchase;
A Sales Contract;
A Fee Simple Deed; or
An Option To Lease Property For Longer Than the Duration of the Lease Term Including All Renewal
Options.//
2.3 EVIDENCE OF CAPABILITY TO PERFORM AFTER AWARD:
Within //60// //90// calendar days after award, the successful Offeror/Lessor shall provide the Contracting
Officer with the following:
A firm commitment of funds in an amount sufficient to perform the work.
Satisfactory title showing fee simple ownership of the property. Fee simple title must be free of any
encumbrances that may limit the rights, responsibilities or liabilities of the parties to the VA lease.
FAILURE TO MEET ANY OR ALL OF THE REQUIREMENTS AS SET FORTH IN PARAGRAPHS
2.2.2.3 AND 2.3, INCLUDING SUB-PARAGRAPHS, WITHIN THE SPECIFIED TIME FRAMES SHALL
BE A BASIS FOR DETERMINATION OF NON-RESPONSIBILITY OR FOR TERMINATION OF THE
CONTRACT FOR DEFAULT.
FAILURE ON THE PART OF THE GOVERNMENT TO ENFORCE ITS RIGHTS TO DECLARE A
DEFAULT WILL NOT BE DEEMED A WAIVER OF ANY OF THE GOVERNMENT' RIGHTS UNDER
S
THIS SOLICITATION.
VA may initiate action to award a contract at any point after review of the initial offers. Therefore, offers
should reflect the Offeror's best terms both from a technical and cost standpoint.
After receipt and evaluation of initial proposals, the Contracting Officer may communicate with Offerors to
establish the competitive range. Communications shall be limited to Offerors:
Whose past performance information is the determining factor preventing them from being placed
within the competitive range, or
Whose exclusion from, or inclusion in, the competitive range is uncertain.
Part I: Basic Solicitation Requirements Page 18 of 169
Lessor __________ Gov't. __________
__________ of __________ Pages