Format a
A/E's ESTIMATE OF ADJUSTMENT IN CONTRACT AMOUNT - SUMMARY
ESTIMATED TIME IN MANHOURS
WORK CATEGORIES
Supervis
Designe Draftsma
Other (Specify)
or
r
n
(1)
(2)
(3)
(4)
(5)
(6)
(7)
Drawings (Data from Format b)
Design Calculations:
Structural
Electrical
Mechanical
Selection of Equipment
Revision of Equipment
Architectural Structural
Specification
Section Nos.
Mechanical-Electrical
Specification
Section Nos.
Construction Time Duties
Cost Estimating
TOTAL
TOTAL COST BREAKDOWN
1.
Supervisor
_________hrs. @ $________/hr.
$___________
2.
Designer
_________hrs. @ $________/hr.
$___________
3.
Draftsman
_________hrs. @ $________/hr.
$___________
4.
Other
_________hrs. @ $________/hr.
$___________
5.
Other
_________hrs. @ $________/hr.
$___________
6.
Other
_________hrs. @ $________/hr.
$___________
7.
Total Design Costs (Lines 1 thru 6)
$______________
8.
Overhead & Profit @__________% (Of line 7)
$___________
9.
Total (Lines 7 and 8)
$______________
Blueprinting 1/
$___________
10.
Special Reproduction and Binding 1/
$___________
11.
Travel 1/
$___________
12.
13.
Additional Item (Specify) _________________
$___________
14.
Additional Item (Specify) _________________
$___________
15.
GRAND TOTAL (Lines 9 thru 14)
$______________
1/ Use additional blank sheets to explain blueprinting charges, specification
reproduction and binding charges, travel charges, etc., and other categories of work
requiring explanation.