A/E's ESTIMATE OF ADJUSTMENT IN CONTRACT AMOUNT
ANALYSIS OF ESTIMATED MANHOURS FOR DRAWINGS
Sheet____of _____
ESTIMATED
TIME IN
MANHOURS
CODE
Technical
Designer
Draftsman
Total
Total
DWG. NO.
ITEM NO.
LETTER 2/
Supervisi
for
(If new
(Circle
Of Work
on
Drawing
indicate
on
thus:
Drawing
1/
"new")
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
TOTAL
1/ Submit blueprints of drawings requiring revision, indicating the portion of drawings which need
revision by circling the portion(s) and identifying each by numbering in Column (2) above.
2/ For Column (3) identify type of work by use of the following code:
A
Architectural
E
Electrical
L
Site Planning
H
B
Subsurface (Structural)
G
Steam Generation
S
Structural
D
Outside Steam Distribution
W
Sanitary
DE
Architectural Miscellaneous Detail
Q
Equipment (Laboratory)
FS
Fallout Shelters
P
Plumbing
--
Other