(f) Additional Conferences. If A/E attendance is required by the Contracting
Officer at additional conferences, the A/E will be reimbursed as prescribed in
SPH 2, Travel Expenses of the article entitled "Reimbursements".
(g) Posting Amendments to Contract Documents. Within Sixty (60) days of the
bid opening date, the A/E shall post all amendments to the drawings and
specification per CP-6 and submit a copy to the Contracting Officer on CD-
ROM.