SPECIAL PROVISIONS
ARTICLE A
CONSTRUCTION DOCUMENTS
SPA 1
DESCRIPTION OF TASK
(a) General Scope. Based upon the approved Schematics and Design
Development Documents, equipment layouts, other program materials furnished by
the VA, and any further adjustments in the design scope or quality of the Project,
the A/E shall ascertain the requirements of this phase of the work and shall prepare,
for approval by the VA, Construction Documents and other documents setting forth
in detail the requirements for bidding and contracting for the construction of the
Project(s) and as further described in the applicable booklets listed in Supplement
B, which detail the minimum requirements for various A/E submissions. The A/E
shall be responsible for the professional quality and technical accuracy of all of the
documents it prepares. Services under these phases shall include:
(1)
Contract Administration.
(2) Site Design Documents setting forth in detail the site construction
requirements including existing grades; rough and finishing grading lawns
and planting and landscaping; location of on-site utility systems, off-site
utility works, fire protection system, drainage system, property lines,
set-back lines, easements, building orientation, site access, land forms,
environmental determinate; and historic and archeological preservation.
(3) Architectural Design Documents setting forth in detail the architectural
construction requirements including complete floor and roof plans,
elevations, sections, details, schedules, material and color selection,
discipline coordination and fire safety systems and controls.
(4) Structural Design Documents setting forth in detail the structural
construction requirements including all structural plans; elevations; sections;
details Structural Design Documents setting forth in detail the structural
construction requirements; schedules; and calculations sizing all columns,
beams, slabs and coordinate the work with all other design disciplines,
especially the mechanical and architectural disciplines.