G.
SANITARY (cont.):
*
Submit utility drawings at same scale as provided for Site Development
drawings.
** Submit utility drawings at same scale as provided for Site Development
drawings, incorporating all of the revisions required by comments from the
schematics phase.
*** Submit utility drawings at same scale as provided for Site Development
drawings, incorporating all of the revisions required by comments from the
design development phase. Submit legend, notes, and details at a scale not
less than 1:100 (1/8 inch).
Program Guide, PG-18-15, Volume C
22
May 2006