14. SCI PT - Separate:
Soiled Utility Area (USCL1) ....................................................80 NSF ( 7.4 NSM)
Minimum NSF and if the number of SCI beds authorized is between sixty and one
hundred. Provide an additional 10 NSF if the number of SCI beds authorized is
greater than one hundred.
15. SCI PT - Separate:
Storage, Equipment (SRE01).............................................. 160 NSF (14.9 NSM)
Minimum NSF and if the number of SCI beds authorized is between sixty and one
hundred. Provide an additional 40 NSF if the number of SCI beds authorized is
greater than one hundred.
16. SCI PT - Separate:
Office, Administration (OFD03) ............................................ 100 NSF (9.3 NSM)
Minimum NSF and if the number of SCI Physical Therapist FTE positions
authorized is two or less and the number of SCI beds authorized is greater than
sixty. Provide an additional 100 NSF if the number of SCI Physical Therapist FTE
positions authorized is greater than three.
SCI Kinesiotherapy (KT) Separate
Provide spaces below only if in authorized Concept of Operations
17. SCI KT - Separate:
Sub-Waiting (WRC01) ............................................................. 40 NSF (3.8 NSM)
Provide one per SCI Kinesiotherapy Separate and if the number SCI beds
authorized is greater than sixty.
18. SCI KT - Separate:
Treatment Clinic (PTTC1) ............................................... 1080 NSF (100.3 NSM)
Minimum NSF and if the number of SCI beds authorized is between sixty and one
hundred. Provide an additional 120 NSF if the number of SCI beds authorized is
greater than one hundred.
19. SCI KT - Separate:
Storage, Equipment (SRE01)................................................ 100 NSF (9.3 NSM)
Minimum NSF and if the projected number of SCI beds authorized is between
sixty and one hundred. Provide an additional 20 NSF if the number of SCI beds
authorized is greater than one hundred.
20. SCI KT - Separate:
Office, Administration (OFD03) ............................................ 100 NSF (9.3 NSM)
Minimum NSF and if the number of SCI Kinesiotherapist FTE positions authorized
is two or less and the number of SCI beds authorized is greater than sixty.
Provide an additional 100 NSF if the number of SCI Kinesiotherapist FTE
positions authorized is greater than three.
SCI Occupational Therapy (OT) Separate`
Provide spaces below only if in authorized Concept of Operations.
21. SCI OT Separate:
Sub-Waiting (WRC01) ............................................................. 40 NSF (3.8 NSM)