26 February 1993
Operating Room
Design Standards
HEATING, VENTILATING AND AIR CONDITIONING
ARCHITECTURAL
Floor Area
200 NSF
Wall Finish
CMU (SC)
AC Load Lights
6.0 W/SF
Ceiling
PL
Wainscot
-
AC Load Equipment
16.0 W/SF*
Ceiling Height
9'-6"
Base
ERF
Number of People
6
Slab Depression
-
Floor Finish
ERF
Noise Criteria
NC-40
Notes:
Lead Lining
-
Room Pressure
POSITIVE**
Dry Bulb Temp Cooling (F)
73
73
Minimum Air Changes per Hour
15 (SA)
Minimum % Outside Air
100
YES
SPECIAL EQUIPMENT
-
NONE
Steam
-
Relative Humidity - Cooling
50 %
Relative Humidity - Heating
50 %
Notes:
ELECTRICAL
* OPERATING LIGHT INCLUDED IN EQUIPMENT LOAD
**PROVIDE OPERATING ROOM WITH HIGHER ROOM POSITIVE
Lighting
Power
PRESSURE THAN ADJACENT ANIMAL SURGICAL PREP ROOM, SCRUB
General
100 FC, 5.0 W/SF*
General
1440 W
AND GOWN ROOM, AND SURGICAL WORK ROOM
Special
**
Special
720 W***
Emergency
50% GEN FLUOR
Emergency
50%
Notes:
*COLOR CORRECTED FLUOR LAMPS
PLUMBING AND MEDICAL GASES
**(1) SURGICAL LIGHT, 2 HEADS
Sanitary Drain
-
Cold Water
-
***(1) CLG CORD
Acid Waste
-
Hot Water
-
Silver Recovery
-
Reagent Water
-
Medical Air
YES
Laboratory Air
-
Medical Vacuum
YES
Laboratory Vacuum
-
Oxygen
YES
Fuel Gas
-
Telephone
WALL MTD
ADP
EMPTY CONDUIT
Nitrous Oxide
YES
Anesthesia Evac
YES
Intercom
PART OF TELEPHONE
Radio
-
Notes:
Public Address
-
Other
-
Notes:
VA Design Guide -- Veterinary Medical Unit
Guide Plate 6-1