ARCHITECTURAL
HEATING, VENTILATING AND AIR CONDITIONING
Floor Area
180 NSF (17.4 NSM)
Wall Finish
GYP. BOARD(SC)
AC Load Lights
3.5 W/SF
-
Ceiling
GYP. BOARD
Wainscot
AC Load Equipment
2.5 W/SF
Base
9'-0" (2.75 METERS)
WSF
Ceiling Height
Number of People
2
Floor Load
100 PSF
6" (152 mm) INTEGRAL
Floor finish
Noise Criteria
NC-40
COVE BASE
Room Pressure
(0)
Lead Lining
-
Note:
Dry Bulb Temp Cooling Range
78 F (25 C)
Refer to PG-18-1 and PG-18-6
72 F (22 C)
Minimum Air Changes per Hour
-
*LEAD LINED DOORS FROM SUPPORT SPACES INTO O.R.
Minimum % Outside Air
100
YES
-
ELECTRICAL
Steam
-
Relative Humidity
50 %
Lighting
Power
Relative Humidity
30 %
General
70 FC, 2.8 W/SF
General
1000 WATTS
Special
-
Special
*
Emergency
Emergency
1000 WATTS
ALL
PLUMBING AND MEDICAL GASES
*(1) STRIP MOLD WITH DUPLEX RECEPTACLES 24" OC ABOVE COUNTER
YES
YES
Cold Water
Medical Air
YES
YES
Hot Water
Medical Vacuum
Sanitary Drain
YES
Oxygen
YES
-
Acid Waste
Nitrous Oxide
-
Silver Recovery
-
-
Anesthesia Evac
-
TELECOMMUNICATIONS
*CONNECT CRP WASTE AND VENT
TO NORMAL STACKS
Patient Monitor
-
Telephone
WALL MTD
-
PART OF TELEPHONE
Nurse Call
Intercom
Code One
-
Public Addr.
-
-
CCTV
ADP
EMPTY CONDUIT
SPECIAL EQUIPMENT
Radio
-
None
Design Guide - Surgical Service
Design Standards
Heart/Lung Machine
Guide Plate:
5-3b
Preparation Room
180 NSF (17.4 NSM)
Date: August 2005