September 30, 1994
Equipment Guide List
EtO Sterilizer/Aerator Room
Equipment Guide List for this area reprinted from 5-2 Preparation, Assembly & Sterilization Area.
SYMBOL
AI
QUANTITY
DESCRIPTION
A
B
C
D
NOTE: PROVIDE EMERGENCY POWER SYSTEM FOR THE ETO STERILIZER/AERATOR, ETO EXHAUST AND
ETO MONITORING EQUIPMENT.
VC
1
AERATOR, FOR 100% ETHYLENE OXIDE GAS
STERILIZER, SINGLE DOOR, RECESSED THROUGH ONE
WALL OR FREE STANDING UNIT, FOR RECESSED UNIT
PROVIDE MOUNTING RACK, FOR FREE STANDING UNIT
PROVIDE STACKING RACK, PROVIDE ELECTRIC AND
EXHAUST AS REQUIRED
CC
AR
ENCLOSURE PLENUM, CRS, BETWEEN TOP OF
AERATOR AND CEILING, PROVIDE EXHAUST LOUVER IN
PLENUM ENCLOSURE PANEL ABOVE DOOR (PG-08-1,
MCS 11710)
VS-325
CC
2
STERILIZER/AERATOR, ETHYLENE OXIDE GAS, SINGLE
DOOR, RECESSED THROUGH ONE OR TWO WALLS,
(CHAMBER SIZE: 24" X 36" X 48"/24 CU. FT.), PROVIDE
STEAM, WATER, DRAIN, ELECTRIC AND EXHAUST AS
REQUIRED (PG-08-1 & PG-08-6, MCS 11710)
VC
2
STERILIZER/AERATOR, 100% ETHYLENE OXIDE GAS,
SINGLE DOOR, RECESSED THROUGH ONE WALL OR
FREE STANDING UNIT, FOR RECESSED UNITS PROVIDE
MOUNTING RACK, FOR FREE STANDING UNIT PROVIDE
STACKING RACK, PROVIDE COMPRESSED AIR,
ELECTRIC AND EXHAUST AS REQUIRED
VS-360
CC
AR
ETHYLENE OXIDE DISPOSER SYSTEM, 838 MM X 889 MM
X 2083 MM (33" X 35" X 82"), PROVIDE ELECTRIC AND
EXHAUST AS REQUIRED (PG-08-1 & PG-08-6, MCS 11710)
VV
1
CONTINUOUS MONITORING DEVICE, ETHYLENE OXIDE
GAS WITH ADDITIONAL SENSORS/ALARMS, ETO
SPECIFIC TO .01 PARTS-PER-MILLION
NOTE: PROVIDE ONE EMISSION CONTROL DEVICE FOR
NO MORE THAN TWO ETO STERILIZERS
CC
AR
MODULAR WALL, ENCLOSURE PANELS, CRS, FROM
FLOOR TO FINISHED CEILING, WITH EXHAUST LOUVER
IN MODULAR PANEL ABOVE DOORS OF STERILIZERS
(PG-08-1 & PG-08-6, MCS 11710)
CC
AR
CART, LOADING, FOR USE WITH STERILIZER/AERATOR,
CHAMBER SIZES: 610 MM X 914 MM X 1219 MM/1524 MM
(24" X 36" X 48"/60") (PG-08-1, MCS 11710)
CC
AR
CARRIAGE, TRANSFER, FOR USE WITH STERILIZER/
AERATOR, CHAMBER SIZES: 610 MM X 914 MM X 1219
MM/1524 MM (24" X 36" X 48"/60") (PG-08-1, MCS 11710)
VA Design Guide -- Supply, Processing, & Distribution
Guide Plate 5-3