Room
Renumbering
Odd / Even Grid
After applying room numbers, based upon the room door opening on to the
corridor, within the grid area, you address the numbering for rooms within rooms.
Scenario
(continued)
Typically these interior rooms, off rooms, are give a sub-set designation. This
designation can be in the form of a letter or number. Using a letter tends to be
easier for people to remember and use.
3B210 - Room with a corridor door in the assigned grid area
3B210A or 3B210a or 3B210.1 - Designation for a room accessed through
the room that is accessed from the corridor.
The preceding illustration shows several examples of how to address rooms within
rooms, rooms extending over several grid zones and two rooms opening in the
same grid zone.
Sequential
With the sequential scheme you take
the floor plan and apply room numbers
Scenario
as you progress down the corridor.
�����
At logical breaks in the corridor, like
�����
�����
can be skipped. This will allow some
�����
flexibility within the sequential system
in case of future room re-configurations
and remodels.
������
�����
�����
The same as the odd/even scenario,
�����
�����
interior rooms, off rooms, are give a
sub-set designation.
This designation can be in the form of a
�����
�����
letter or number. Using a letter tends to
�����
�����
be easier for people to remember and
use.
������
�����
NOTE: While the adjacent illustration is
showing the use of a number and letter
�����
�����
designation system (ie 4B109), a five
�����
number designation works equally as
well (ie 42109).
�����
�����
�����
�����
�����
������
�����
������
�����
02/2005
Page 9- 13