July 2006
H-18-8
3.6 Story Drift Limitations
The calculated story drift for the construction of all new Critical and Essential
Facilities shall not exceed 50% of the values allowed by ASCE 7.
No action regarding seismic rehabilitation of existing buildings need be undertaken
in moderate-low and low zones.
11