Spinal Cord Injury Center Design Guide
July 1990 (Rev. Jan. 2004)
Typical Corridor Section 49
Function:
Circulation Space.
Space Requirement:
As Required.
Architectural:
Finish Code:
1-H
Floor Finish:
Base:
Vinyl
Wall Finish:
Veneer Plaster/Paint
Ceiling:
Acoustical Tile
Ceiling Height:
8'-0"
Noise (STC Rating):
30
Slab Depression:
None
Special Construction:
-
Hardware:
-
Doors:
Smoke doors as required, wainscot height kickplates.
Windows:
None Required
HVAC:
Temperature:
Summer: 78@50%RH
Winter:
82@30%RH
Min. Air Changes/Hour: None (see HVAC Note 3)
Min. % Outside Air:
15%
Pressure:
(0)
% Filtration:
30%(PF)/85%(AF)
Noise Criteria:
40
A/C Loads:
Lights:
Subject to floor plan layout
Equipment: Subject to floor plan layout
People:
Subject to floor plan layout
Electrical:
Lighting Levels:
Gen. Illum: 20fc min.
Emergency Power:
Equipment Table:
As Required.
Office of Facilities Management
245