Function:
The Entrance Canopy is intended to provide weather protection to those entering the SCI Center. The
Entrance Vestibule is intended as an energy conservation airlock.
Snow melting systems: As required and appropriate to suit weather conditions.
Space Requirement:
As Required.
Architectural:
Finish Code:
1-H (Vestibule)
Floor Finish:
Base:
Vinyl
Wall Finish:
Veneer Plaster*/Paint
Ceiling:
Acoustical Tile
Ceiling Height:
8'-0"
Noise (STC Rating):
30
Slab Depression:
None
Special Construction:
-
Hardware:
156 (both doors)
Doors:
2/3'-0" x 7'-0" metal with full glazing, automatic sliders electric eye,
breakaway hardware.
Windows:
None Required
HVAC:
Temperature:
Summer: 78@50%RH
Winter:
72@30%RH
Min. Air Changes/Hour: None (see HVAC Note 3)
Min. % Outside Air:
15%
Pressure:
Positive
% Filtration:
30%(PF)
Noise Criteria:
50
A/C Loads:
Lights:
Subject to floor plan layout
Equipment: Subject to floor plan layout
People:
Subject to floor plan layout
Electrical:
Lighting Levels:
Gen. Illum:
In airlock:
20fc
Under canopy: 10fc
Equipment Table:
As required.