Spinal Cord Injury Center Design Guide
July 1990 (Rev. Jan. 2004)
On-Call Toilet/Shower 25-B
Function:
This space is intended to support the On-Call Bedroom described on the previous sheet.
Space Requirement:
45 NSF
Architectural:
Finish Code:
2-G
Floor Finish:
Ceramic Tile (slip-resistant)
Base:
Ceramic Tile
Wall Finish:
GWB/4'-0" CT Wainscot
Ceiling:
Acoustical Tile*
Ceiling Height:
8'-0
Noise (STC Rating):
30
Slab Depression:
@Shower, see SD-10800-2.DWG
Special Construction: -
Hardware:
18
Doors:
3'-0" x 7'-0" wood
Windows:
None
*Shower will have full CT walls and Plaster Ceiling.
HVAC:
Temperature:
Summer: -
Winter:
72
Min. Air Changes/Hour:
Min. % Outside Air:
-
Pressure:
Negative
% Filtration:
-
Noise Criteria:
40
A/C Loads:
Lights:
-
Equipment: -
People:
-
Electrical:
Lighting Levels:
Gen. Illum: 30 fc
Emergency Power:
-
Office of Facilities Management
146