Linen Holding 23
Function:
This space provides a central holding area away from the Nursing Unit for both soiled and clean bulk
linen. Always located on the ground floor, this space should be accessible from the outside for truck pick-
ups. To be provided only when SCI is in a stand-alone configuration.
Space Requirement:
1.2 NSF/Bed, 60 NSF Minimum
Architectural:
Finish Code:
1P
Floor Finish:
VCT
Base:
Vinyl
Wall Finish:
Veneer Plaster*
Ceiling:
Gypsum Wall Board/Paint
Ceiling Height:
9'-0"
Noise (STC Rating):
N/A
Slab Depression:
None
Special Construction: -
Hardware:
43
Doors:
3'-8" x 7'-0" metal
Windows:
None
*Special Coating, see Mspec #09815
HVAC:
Temperature:
Summer: -
Winter:
72
Min. Air Changes/Hour:
Min. % Outside Air:
-
Pressure:
Negative
% Filtration:
-
Noise Criteria:
40
A/C Loads:
Lights:
-
Equipment: -
People:
-
Electrical:
Lighting Levels:
Gen. Illum: 30fc
Emergency Power:
-