Spinal Cord Injury Center Design Guide
July 1990 (Rev. Jan. 2004)
Tubroom 10
Function:
This space is intended to provide tub bathing facilities as well as some on-ward hydro-therapy capability.
Space Requirement:
195 NSF
Architectural:
Finish Code:
2-B
Floor Finish:
Ceramic Tile (slip-resistant)
Base:
Ceramic Tile
Wall Finish:
GWB/4'-0" Ceramic Wainscot
Ceiling:
Acoustical Tile/Special-Faced
Ceiling Height:
9'-0"
Noise (STC Rating):
30
Slab Depression:
4" for ceramic tile, sloped to drain.
Special Construction:
-
Hardware:
5
Doors:
4'-0" x 7'x 0" wood or metal
Windows:
None
HVAC:
Temperature:
Summer: 78
Winter:
82
Min. Air Changes/Hour:
Min. % Outside Air:
-
Pressure:
Negative
% Filtration:
-
Noise Criteria:
45
A/C Loads:
Lights:
-
Equipment: -
People:
-
Electrical:
Lighting Levels:
Gen. Illum: 30fc
Emergency Power:
One Ceiling Light
Nurse Call
Office of Facilities Management
81