Spinal Cord Injury Center Design Guide
July 1990 (Rev. Jan. 2004)
Soiled Utility 7-A
Function:
This space is intended for the cleaning of equipment and instruments, the disposal of wastes, and the
temporary holding of material on its way to SPD and of trash. This space should be easily accessible
from the Hopper/Shower Room.
Space Requirement:
4 NSF/Bed, 120 NSF Minimum.
Architectural:
Finish Code:
1-P
Floor Finish:
Base:
Vinyl
Wall Finish:
Veneer Plaster *
Ceiling:
Gypsum Wallboard/Paint
Ceiling Height:
9'-0"
Noise (STC Rating):
30
Slab Depression:
None
Special Construction: 1 Hour Fire-rated Enclosure and Sprinklers.
Hardware:
43
Doors:
3'-8" x 7'-0" wood or metal "C" Label, optional wire-glass view panel.
Windows:
None
*Special Coating, see Mspec #09815
HVAC:
Temperature:
Summer: -
Winter:
72
Min. Air Changes/Hour:
Min. % Outside Air:
15%
Pressure:
Negative
% Filtration:
30%(PF)/85%(AF)
Noise Criteria:
40
A/C Loads:
Lights:
-
Equipment: -
People:
-
Electrical:
Lighting Levels:
Gen. Illum: 20fc
Emergency Power:
Nurse Call
Office of Facilities Management
71