Department of Veterans Affairs
Program Guide PG-18-14
Office of Facilities Management
Chapter - 202
December 2004
ROOM FINISHES, DOOR AND HARDWARE SCHEDULE
Service Substance Abuse Clinic
Where Treatment Clinics are not located at a VAMC, all doors shall be 6'-8" in lieu of
7'-0".
ROOM OR SPACE
DOORS
HARDWARE
FLOOR
BASE
WALLS
WAINS
CEILING
DOOR
H.W.NO.
SYMBOL
Administration Space:
Office, Nurse/
CP
RB
GWB-W
AT
1/2 S
23
Pharmacist
GWB-W1
AT/GWB1
Office, Physician
CP
RB
1/2 S
23
GWB-W1
AT/GWB1
Office, Psychologist
CP
RB
1/2 S
23
/Chaplain
GWB-W1
AT/GWB1
Office,
1/2 S
23
CP
RB
Rehabilitation
Counselor
GWB-W1
AT/GWB1
Office, Social
CP
RB
1/2 S
23
Worker
Office Clerk
CP
RB
GWB
AT
1/2 S-T
23
Clinic Space:
Reception and
VCT/CP
RB
GWB-W
AT
1/2
23
Control Area
S-T/Open
Waiting Area
VCT/CP
RB
GWB-W
AT
3/4 S-T/
67
Open
GWB-W1,2
AT1
Group Therapy/
VCT/CP
RB
1/2 V-T
52
Conference Room
Specimen Toilet
CT
CT
GWB
CT 4'0"
AT
1/2 S
14
Utility & Storage
VCT
RB
GWB
AT
1/2 V-T
76
9/10 V-W
42
Lockers, Lounges,
See Chapter 410
Toilets and Showers
(LLTS)
813
Corridor
VCT
RB
GWB
AT
1/2 VV-T
1
Design and Construction Procedures PG-18-3, Topic 11, "Noise Transmission Control".
2
Provide acoustical/ tackable wall surface on one wall.
3
See Section II, "Doors and Hardware".
28