Department of Veterans Affairs
Program Guide PG-18-14
Office of Facilities Management
Chapter - 104
December 2004
ROOM FINISHES, DOOR AND HARDWARE SCHEDULE
Service - Spinal Cord Injury (SCI)
ROOM OR SPACE
DOORS
HARDWARE
FLOOR
BASE
WALLS
WAINS
CEILING
DOOR
H.W.NO.
SYMBOL
GWB1
80
Treatment Clinic
VCT
RB
AT
3/4 SS-T/
ADO3
126
Activities of Daily Living:
Kitchen
VCT
RB
GWB
AT
Bedroom
CP
RB
GWB-W
AT
1/2 S
7
Bathroom
CT
CT
GWB
CT 4'0"
GWB
1/2 S
18
69
Therapeutic Pool
CT
CT
CT Full
PCP
3/4 X-T/
ADO2
120
Height
CT2
Shower/Toilet
CT
CT
CT
PCP
4'-0"
Suits/Towels
CT
CT
GWB
AT (SP)
1/2 U-T
69
69
Pool Vestibule
CT
CT
GWB
AT (SP)
1/2 U/
ADO3
120
SCI Chief's
VCT/
RB
GWB
AT
1/2 U
52
Office
CP
1
See Design and Construction Procedures PG-18-3, Topic 14,"Physical Security
Requirements and Options".
2
Veneer Plywood Surface.
3
See Architectural Design Manual PG-18-10, "Automatic Doors".
1
See Design and Construction Procedures PG-18-3, Topic 14,"Physical Security
Requirements and Options".
2
CT full height in shower on concrete backer board.
3
See Architectural Design Manual PG-18-10, "Automatic Doors".
18