FINAL DRAFT 9/6/95
UPDATED NOV. 1996
Design Standards
Non-Imaging Procedure Room (Alternate Exercise Room)
ARCHITECTURAL
CONDITIONING
Ceiling:
Acoustical ceiling tile
0
0
Ceiling Ht:
2890 mm (9'-6")
Dry Bulb Temp Cooling :
25 C(78 F)
0
0
Wall Finish:
Paint
22 C(72 F)
Wainscot:
---
Minimum % Outside Air:
---
Base:
Integral welded seam
Yes
sheet flooring base
Noise Criteria:
NC 40
Floor Finish:
Welded seam sheet flooring
Steam:
---
Slab Depr.:
1220 mm (4')
Relative Humidity/Cooling:
50%
Notes:
1150 mm (3'-10") wide door
Relative Humidity/Heating:
30%
Minimum Air Changes/Hr.:
12
SPECIAL EQUIPMENT
Room Pressure:
Negative
2
---
AC Load-Equipment:
195 w/m (18 w/sf)
2
AC load-Lighting:
20 w/m (1.75w/sf)
ELECTRICAL LIGHTING
Number of People:
6
General:
---
Yes
Notes:
1. 600 mm x 600 mm (2' x 2')
Notes:
1. Verify equipment AC as per
actual equiment furnished.
fixtures, acrylic prismatic
lens, W/2- R32T8 lamps,
PLUMBING AND MEDICAL GAS
4100 deg K, CRI-85 (min).
Cold Water:
Yes
Hot Water:
Yes
POWER
Laboratory Air:
Yes
General:
---
Laboratory Vacuum:
Yes
Emergency:
---
Sanitary Drain:
Yes
Notes:
---
Reagent Grade Water:
Check with Medical
Center
Medical Air:
Yes
ADP:
---
Medical Vacuum:
Yes
Radio:
---
Oxygen:
Yes
Telephone:
---
Notes:
1. Sanitary waste and vent
Intercom:
---
needs to be chemical
Public Addr:
---
resistant type.
Notes:
---
2. Natural gas is required for
fume hood.
VA DESIGN GUIDE
NUCLEAR MEDICINE SERVICE
5-3