June 99
SYSTEM OR SUBSYSTEM
CODE
UNIT OF MEASURE
NAME
A
B
C
D
SPECIAL CONSTRUCTION
11
30
m2 (SQ FT) OF ROOM
SPECIAL PURPOSE ROOMS
01
m2 (SQ FT) OF ROOM
AUDIOMETRIC
01
m2 (SQ FT) OF ROOM
CLEAN
02
m2 (SQ FT) OF ROOM
OTHER SPECIFY:
03
PROTECT AREA m2 (SQ FT)
02
VOLUME m3 (CU FT)
THERAPEUTIC POOLS
03
OTHER SPECIAL CONSTRUCTION
04
SPECIFY:
TOTAL BUILDING COST
__
__
__
__
DESIGN NET AREA
m2 (SQ FT)(INCL IN PROJ)
SITEWORK
12
m2 (SQ FT)(INCL IN PROJ)
SITE PREPARATION
10
m2 (SQ FT)(CLEARED)
CLEARING
01
DEMOLITION (GENERAL)
02
LUMP SUM
m3 (CU FT) BUILDING
DEMOLITION (BUILDING)
03
m2 (SQ FT)(INVOLVED)
EARTHWORK (SITE)
04
m2 (SQ FT)(INCL IN PROJ)
SITE IMPROVEMENTS
20
m2 (SQ YDS) SURFACE
PAVING (OTHER THAN MASONRY)
01
m2 (SQ FT) LANDSCAPING
LANDSCAPING
02
m3 (CU YDS) CONCRETE
CONCRETE-FORM-RB (SITE)
03
PRECAST COMPONENTS (SITE)
04
LUMP SUM
m2 (SQ FT) SURFACE
MASONRY PAVING (SITE)
05
MISC ORNAMENTAL MTLS (SITE)
06
kg (POUNDS) METAL
FLAG POLES
07
# OF POLES
FREE STANDING STACKS
08
HEIGHT OF STACK m (FT)
m2 (SQ FT)(INCL IN PROJ)
SITE UTILITIES
30
TUNNELS
01
LENGTH IN m (FT)
m2 (SQ FT) SPRINKLED
LAWN SPRINKLERS
02
MECH UTILITIES
03
LENGTH OF PIPE
ELEC UTILITIES
04
KVA OF SUBSTATIONS
05
KVA OF SUBSTATIONS
m2 (SQ FT) OF BLDG/ENCLOS
SUBSTATIONS/XFMR BUILDING OR
06
ENCLOS (UNLESS SELF CONTAINED)
07
m2 (SQ FT) BLDG/BLDGS
EMER GEN BLDG/ENCLOSURE
08
m2 (SQ FT) BUILDING
CHILLER BUILDING
09
m2 (SQ FT) BUILDING
BOILER PLANT
10
CONVENTIONAL ENERGY SUPPLY
11
(OIL TANKS, GAS METERS, ETC.)
m2 (SQ FT) SOLAR PANEL
SOLAR ENERGY SYSTEM (SITE)
12
(COLLECTION, DISTR, STORAGE)
OFF SITE WORK
40
LUMP SUM
SPECIFY:
TOTAL BASE CONSTRUCTION COST
__
__
__
__
ATTACHMENT "E" PAGE 5 OF 5