June 99
12.
SITE WORK
A. This element includes all work outside the immediate building confines
and is subdivided at level B into the following:
- Site Preparation - clearing, demolition and earth moving
- Site Improvement - landscaping, paving, parking, roads, etc.
- Site utilities - sewers, water, power, etc.
Storm & sanitary sewers
Domestic water, fire protection water, hot & chilled water
Electrical
Utilities
Substations, etc.
- Off-site work - for special railroad and marine work and any other off-site
construction required
Note that general grading to reduce levels over the site occupied by the
building will be included in this section.
This site utilities sub-section does not include the following elements:
Heat Generating System
Cooling Generating System
These elements are contained within the Mechanical (08) section of the
Logic Tree.
The Site Utility sections of the Logic Tree, therefore, contain distribution
elements only, with source elements being contained within buildings.
ATTACHMENT "D" PAGE 6 of 6