DATE
SHEET NO.
ESTIMATE WORKSHEET
OF
PROJECT NO.
LOCATION
PROJECT NAME
101-001
VAMC, ANY CEMETERY, USA
SAMPLE PROJECT
NEW
ALT.
TYPE OF ESTIMATE
ESTIMATOR
INDEX NO.
BUILDING NO./NOS.
ESTIMATE NO.
DD1
JOHN DOE
X
1000.0
ADMINISTRATION BUILDING
CD-1
CODE
LABOR
MATERIALS
SYSTEM/SUBSYSTEM
TOTAL
A
B
C
D
QUANTITY
UI
N
T
$/UNIT
TOTAL
QUANTITY
UI
N
T
$/UNIT
TOTAL
COST
02
SUBSTRUCTURE
55,255
SF
.49
27,217
55,255
SF
.92
50,858
78,075
10
SLAB ON GRADE
55,255
SF
.49
27,217
55,255
SF
.92
50,858
78,075
01
10 MIL POLY
55,255
SF
.02
1,105
55,255
SF
.05
2,763
3,868
02
EDGE FORM
3,350
LF
2.00
6,700
3,330
LF
.50
1,675
8,375
03
4000 PSI CONC. CURED
844
CY
23.05
19,454
844
CY
54.00
46,158
65,612
30
BASEMENT WALLS
-0-
03
SUPERSTRUCTURE
10
FLOOR (AT MECHANICAL
2,980
SF
.47
1,406
2,980
SF
.93
3,194
4,600
01
WIRE MESH
32
SF
8
256
32
SF
16.00
512
768
02
4000 PSI CONC.
49
CY
50.50
2,475
2,475
03
PUMP CONC.
49
CY
4.00
196
49
CY
3.00
147
343
04
PLACE, FINISH, CURE
2,980
SF
.32
954
2,980
SF
.02
60
1,014
CEM -18a
VA FORM
DEC 1995