June 99
6. IDENTIFICATION OF DRAWINGS
a. Bind all drawings into sets and identify drawing classification,
relative order of issue, amendment, and change order by symbols placed
on drawing title blocks as described below:
Cover sheet(include Index to Drawings on small projects)
Index to Drawings start with................................................................... X1
Sub-Surface Investigation start with ...................................................... B1
Site Development (including Irrigation and Demolition) start with ..........L1
Sanitary start with..................................................................................W1
Irrigation....................................................................................................I1
Demolition ..............................................................................................D1
Asbestos Removal start with ............................................................ ASB1
Architectural start with...............................................................................1
Structural start with ................................................................................ S1
Heating, Ventilating, and Air Conditioning start with............................... H1
Plumbing start with................................................................................. P1
Electrical start with ................................................................................. E1
National Cemetery Master Plans start with......................................... MP1
(1) Drawings for each new project shall begin with number one. The
drawings will be distinguished by their project titles and dates.
(2) The preferred method for classifying drawings is by identification of
technical information shown on drawing, for example, Architectural or
Electrical. However, an exception is made when one design discipline
has limited work. Show this limited work on a drawing with another
classification. The drawing number shall show the symbol for the major
work classification; indicate that other work is shown on the same drawing
by a description, such as in Plumbing, above the title block.
(3) When work including two or more buildings is described on a
single drawing, the sheet shall bear the number of the building involving
the work of the major magnitude; indicate that work on other buildings is
shown on the same drawing by a note above the title block.
b. Amendment Construction Drawings
(1) Issue a drawing which is produced to supersede an original
working drawing as a corrected photocopy mylar reproduction of the
original drawing, if practicable. Identify the number of this amendment
drawing with the number of the sheet it replaces plus the suffix "R".
ATTACHMENT PAGE 3 OF 5