SOLICITATION FOR OFFERS
OUTPATIENT CLINIC
SFO NO. V101-183R-xxx-xxx-xx
[INSERT LOCATION OF FACILITY]
LOCATION
Type
Size (in)
Sewer
Remarks
B
3
S/ST
Machine Room
B
4
S
With 1/2 grate when
Mechanical Equipment Room
adjacent to
equipment
R
4
S
Water Softener
Miscellaneous Areas:
B
4
ST
Finished Walk Areaway
B
3
ST
Window Well Areaway
Legend for Floor Drain Table:
S = Sanitary Sewer
CI = Cast Iron
ST = Storm Sewer
NB = Nickel Bronze
Types:
M-NB Funnel Strainer
B-CI W/NB Grate
N-NB Extended Rim
C-Finished Areas
O-12") Square
D-Latex Mastic Floors/Thin Set Tile
P-12" Square w/Grate
E-12" CI W/Sediment Bucket
R-8" Square
F-Seamless Vinyl Floors
S-12" Square w/Grate
G-Porcelain Enamel Interior w/NB
T-CRP w/Funnel
Frame and Grate
V-CI w/Funnel
L-Flushing Rim
X-CRP
H-12" x 6" deep CI
Y-9" CI W/Sediment Bucket
NOTES:
1.
Floor drains for general floor drainage are located by architectural drawings. Use Type "C" in
finished areas.
2.
Connect cooling tower drain, overflow and blowdown to sanitary sewer.
3.
Provide hub at floor level for ethylene oxide sterilizer fitting. Caulk fitting tight in hub.
4.
Provide trap primer for all drains not receiving a direct discharge.
Provide equipment base and vibration isolators based on the latest ASHRAE Handbook HVAC
Applications.
Editing Note: include following paragraph(s) if
required by program. Edit to suit project requirements.
6.6.12 //CLINICAL LABORATORY GAS AND VACUUM SYSTEMS// //RESERVED//:
//
Design and construct laboratory compressed air, laboratory vacuum, natural gas and miscellaneous
laboratory cylinder gas systems in accordance with current editions of NFPA 54 and 99, VA Master
Construction Specification 15488 and the following:
6.6.12.1 CENTRAL SUPPLY SYSTEMS:
Provide minimum 100 psi laboratory air at the compressor discharge. Run 100 psi air to a storage room (or
other non-working or unfinished space) in the laboratory area being served. Valve and cap the 100 psi air
line for future connection. Tee off the 100 psi line and locate a pressure regulating valve to reduce the air
pressure to 50 psi. Run 50 psi air to all outlets in laboratory hoods and benches.