JULY 2005
SOLICITATION FOR OFFERS
OUTPATIENT CLINIC
SFO NO. V101-183R-xxx-xxx-xx
[INSERT LOCATION OF FACILITY]
med staff area, telephone switchboard, security office or other continuously staffed location. Coordinate
both master alarm panel locations with the user facility and the other design services. Include an area
alarm for each system at the nurses station in all areas where medical gas and vacuum station outlets and
inlets are installed.
6.6.9
PLUMBING FIXTURE SCHEDULES:
Water supply fixture units and minimum fixture outlet pipe sizes shall be per UPC Table 6.4, latest edition.
Drainage fixture unit values and minimum size trap and trap arm shall be derived by referring to UPC
6.6.10 FLOOR DRAIN SCHEDULE:
Editing Note: delete rooms or areas not required in
project.
Floor drains shall be located per the attached schedule.
LOCATION
Type
Size (in)
Sewer
Remarks
Dietetic Areas:
S
3
S
Vending Machine Room
Film Processing Areas:*
T
2
S
At XP-6 w/full flow
Cardiac Cath. Dark Room
thru funnel
T
3
S
W/full flow thru
Processing Unit
funnel
T
2
S
Roll Processing
X
2
S
Chemical Storage Sump
*When WSF flooring is used, provide Type "F" epoxy coated w/full flow funnel.
Clinic Areas:
D
3
S
Bldg. Management/Storage
L/S
3
S
At Foot of Table
Cysto Room
C
2
S
Adjacent to Tub
Hydrotherapy Area (stainless steel)
M
2
S
Ice Machine
F
3
S
Laboratory
C/D
3
S
Shower, Double
C/D
2
S
Shower, Single
R/S
4
S
SPD Sterilizers
D
3
S
Trash Collection Room
R
4
S
2" hole in grate
Washer Sterilizers
Mechanical Equipment Areas:
B
3
S
Modify with Funnel
B
3
S/ST
With 1/2 grate
Fan Room
Part I: Basic Solicitation Requirements Page 107 of 169
Lessor __________ Gov't. __________
__________ of __________ Pages