JULY 2005
SOLICITATION FOR OFFERS
OUTPATIENT CLINIC
SFO NO. V101-183R-xxx-xxx-xx
[INSERT LOCATION OF FACILITY]
//ETO - Ethylene Oxide Sterilizers Exhaust//
Energy Efficient Motors.
6.5.1.4 ESTIMATED ENERGY CONSUMPTION:
With the final design submission of construction documents phase, the Lessor shall estimate the
energy consumption of the proposed new building(s) and provide a value in British Thermal Units
(BTUs) per gross square foot (GSF) per year for each building.
The building(s) operation shall be simulated on the basis of actual mechanical/electrical systems
design.
6.5.1.5 CLIMATIC CRITERIA:
The capacity calculations for the HVAC systems shall be based on the outdoor design conditions listed in
latest ASHRAE Fundamentals Handbook. Use the following columns:
Summer: 0.4 percent design dry bulb and wet bulb
Winter: 99.6 percent design dry bulb
Wet bulb design temperature for cooling tower: 0.4 percent
Size pre-heat coils based on Annual Extreme Daily-Mean dry bulb temperature listed in Min. Column.
Editing Note: coordinate with Natural Disasters Non-
structural Resistive Design in Paragraph 4.2.8.
//Provide emergency heat based on 99.6 percent design dry bulb temperature//
6.5.1.6 INDOOR DESIGN CONDITIONS:
Editing Note: delete spaces or functions not in the
program. Adjust temperatures for area of country in
which project is located.
The following table lists summer and winter indoor dry bulb and relative humidity design conditions.
Areas
Summer DB
Summer
Winter
Winter
DB ( F)
Relative
(F)
Relative
Humidity
Humidity (%)
(%)
Auditoriums
76
60
72
--
Bathrooms & Toilet
78
--
72
--
Rooms
Blood Banks
72
50
72
30
Computer Rooms
70
40 (+5)
70
40 (+5)
CT Scanner
76
50
78
30
Dialysis Rooms
78
50
72
30
Dining Rooms
78
50
72
30
Dry Labs
78
50
72
30
Electrical Equipment
Ventilation Only
50
--
Rooms
Elevator Machine
94
--
50
--
Rooms, Hydraulic
Part I: Basic Solicitation Requirements Page 88 of 169
Lessor __________ Gov't. __________
__________ of __________ Pages