Ceiling Performance Specifications: Design Proposal
773
DESIGN PROPOSAL
773.1
GENERAL
Not later than the date specified in 771.4.3 above, each bidder shall
submit a Design Proposal to the Office of Construction for evaluation and
approval of his design solution. No additional material will be accepted
after that date unless specifically requested by the O/C. Evaluations and
notifications of approval or disapproval will be returned to all bidders by
the date given in 771.4.4 above. Since disapproval shall constitute
disqualification of the bidder, it is recommended that all bidders maintain
liaison with the O/C and the A/E during the Design Phase to assure
responsiveness of their submissions.
773.2
DESCRIPTION OF THE DESIGN
773.2.1
The Proposal shall be in the form of a written description of the bidder's
design with appropriate visual material such as drawings, photographs or
models. No verbal presentation will be permitted. The Proposal shall
include specific statements describing how the design will meet each and
every requirement established in these Specifications. Description must
be in sufficient detail to permit an accurate assessment of the capabilities
and limitations of the design. Include all available reports of tests by
recognized testing agencies giving performance data for components
already in production. Prices are not required. All submitted material will
be kept confidential.
773.2.2
The Component Contractor shall be responsible for all work listed in
772.1. However, to ensure comparable bids with respect to services
offered, bidders shall submit lists of the specific items they regard as being
inclusive and exclusive of their designs. These lists will be used by the
O/C to clarify this aspect of the program before priced proposals are
submitted.
773.2.3
The description shall include all special requirements, such as clearances
from other building, tolerances of other building, and items required to be
supplied by others. The Proposal shall also describe the process of
fabrication and installation of all ceiling components, including the
relationship to other contractors and trades. Specific reference shall be
made to:
1. Fabrication location and procedures.
3 - 235