Ceiling Performance Specifications: Scope
772
SCOPE
772.1
INCLUDED
772.1.1
Development Phase
1. All necessary product research, development and testing.
2. Design coordination with the VA, A/E and General Construction
Contractor (or Construction Manager if used).
3. Descriptive material and samples as required by VA, A/E and GCC (or
CM).
4. Supply, installation and testing in mock-up and/or prototype as
required.
5. Information Manual and unit prices.
772.1.2
Construction Phase
1. All equipment, materials, labor and supervision required for the
manufacture, supply, storage, weather protection and installation of all
ceilings in the hospital, except in service bays.
2. Construction coordination with VA, A/E and GCC (or CM).
3. Shop drawings.
5. Platform and walking surface.
6. Horizontal frame and bracing as required.
7. Ceiling base and finish.
8. Access doors through ceiling and platform.
9. All clips, anchors, spacers, edge trim and other attachments and
accessories necessary for a complete finished installation.
10. Sealants, gaskets, etc., as required for sound and air tightness.