530
Cost Base: Component Costs
Table 530-6.
PLUMBING COST BREAKDOWN
Dollars per outside gross square foot adjusted to an ENR Building Cost
Index of 960.
MED. FIRE
EQUIP. PIPING GAS. PROT. TOTAL FIXT.
Miami VAH
.04
1.49
.38
.29
2.20
.60
Memphis VAH
.04
1.37
.50
.18
2.09
.83
Average
2.15
.74
533.6
ELECTRICAL POWER DISTRIBUTION
Table 530-7 lists the costs of the major electrical power distribution
components.
Table 530-7.
ELECTRICAL COST BREAKDOWN
Dollars per outside gross square foot adjusted to an ENR Building Cost
Index of 960.
FEEDER
BRANCH
EQUIP.
DISTRIB.
DISTRIB.
TOTAL
Miami VAH
.41
.18
1.54
2.13
Memphis VAH
.38
.19
1.51
2.08
Average
2.11
2 - 187