Cost Base: Component Costs
533
COMPONENT COSTS
533.1
STRUCTURE
Table 530-2 lists the costs of the major structural components at Miami
and Memphis. Neither of them use shear walls. Cost differences between
the tower and base floors below the tower are due to larger columns.
Reduced load capacity requirements account for the lower cost of roof
construction.
Table 530-2.
STRUCTURAL COST BREAKDOWN
Dollars per square foot of framed area (except as indicated) adjusted to
ENR Building Cost Index of 960.
CONC.
STRUC. TOPPING
CONC. & FINISH
REBAR
TOTAL
Miami VAH
.07
||content||
.75
.44
3.07
0.62
1.75
5.44
Lower floor below tower
3.85
0.62
2.09
6.56
Roof framing
2.94
0.31
1.68
4.93
Aggregate:
5.50 per sq. ft. of structural frame
6.58 per outside gross square foot
Memphis VAH
.21
||content||
.27
.69
3.80
0.21
1.16
5.17
Lower floor below tower
4.45
0.21
1.33
5.99
Roof framing
3.36
0.97
4.33
Aggregate:
5.26 per sq. ft. of structural frame
6.38 per outside gross square foot
533.2
CEILINGS
Table 530-3 lists the costs of the major types of ceiling. The ceiling costs
in the support areas of the two hospitals averages somewhat less per
gross square feet of floor area than in the bed-care areas because there
are large areas of shop, storage and boiler room uses, which have merely
paint on the structure. Miami utilized a significant amount of cement
enamel in moist areas.
2 - 182