1.4.3 EQUIPMENT SCHEDULES
1.4.3.1 Equipment schedules shall be listed in the following order,
vertically, from left to right, to facilitate checking and future
reference. Trade names or manufacturers model numbers shall not be
shown.
for the various occupancies)
(c) Air Flow Measuring Devices
(d) Air Handling Equipment
(e) Air Separators
(f) Chillers, Condensing Units, Air Cooled Condensers
(g) Heat Exchangers
(h) Cooling Towers
(i) Engineering Control Center
(j) Expansion Tanks
(k) Fans
(l) Fan-coil Units, Air Terminal Units (Boxes)
(m) Filters for closed loop Water Systems (chilled water and hot water)
(o) Heat Recovery Equipment
(p) Humidifiers
(q) Pre-filters and after-filters (may be combined with pre-filters)
(r) Preheat Coils, Cooling Coils, Reheat Coils
(s) Pressure Reducing Valves, Safety Valves
(t) Pumps
(u) Radiant Panels
(v) Room By Room Air Balance
(w) Sound Attenuators
HVAC DESIGN MANUAL
1-20
GENERAL REQUIREMENTS