9. CONSTRUCTION CONTRACTOR CERTIFICATION:
CERTIFICATION ON ASBESTOS ABATEMENT
FOR
THE DEPARTMENT OF VETERANS AFFAIRS
CONSTRUCTION PROJECTS
1.
I certify that the asbestos abatement of buildings _______________
which are renovated under Project No. ___________ located at VAMC,
__________________ has been successfully completed in accordance with the
drawings and specifications.
These documents were prepared under my
supervision (which were reviewed and approved by me prior to construction).
2.
I certify that all impacted spaces have achieved the
3.
I certify that during the entire abatement process and for all
impacted areas, the maximum protection of people and the environment that
known technology can provide, has been achieved.
4.
I further certify that during the abatement process all the
applicable regulations and the provisions of the Veterans Administration
Asbestos Policy have been observed.
5.
The specific results of my final clearance testing and inspection
for each regulated area are attached.
The final clearance testing and
inspection was performed under my supervision prior to turning each space
over to the VAMC for further remodeling work.
_______________________________________________
PIH/CIH NAME & CERTIFICATION NO. (If applicable)