(f) Reviews. The number of VA reviews of the work shall be as indicated in
the Submission and Completion Schedule under Article entitled "Submission and
Completion Schedule". VA review of the A/E's work product shall not be
construed by either party to relieve the A/E from its professional responsibility
to execute drawings, specifications and other work submissions with due care
and in accordance with acceptable professional standards.
SPA 3
RENDERINGS
The A/E shall prepare renderings (pictorial) presentations of professional delineator
quality as described in material furnished by VA and consisting of:
______ Black and White Elevation View(s)
______ Elevation View(s) in Color
For each rendering required above, provide the following:
(a) Original rendering(s)
(b) Full-size Color photograph(s) of rendering(s)
(c) Colored 8" x 10" glossy prints (6 copies)
(d) Color transparency, 8" x 10" (one copy)
(e) Slide, 35 mm. 2" x 2" (one copy)
(f) Color negative, 4" x 5" (one copy)