Department of Veterans Affairs
National Cemetery System
(d) Include all files, both graphic and non graphic, required for the
project (i.e., color tables, pen tables, font libraries, cell libraries, user
command files, etc.)
(e) Make sure that all support files such as those listed above are in
the same directory and that references to those files do not include device or
directory specifications.
(f) Include any standard sheets (i.e., abbreviation sheets, standard
symbol sheets, etc.) necessary for a complete project.
(2) Documentation: All deliverable files shall be documented with the
appropriate documentation including, but not limited to, the file names of
each design file, the level structure of each file, the active levels required to
plot each design drawing, all active reference files, all active cell
libraries...etc.. This documentation should be provided in a standard ASCII
format.
(3) Hard copy: Plotted copies of all drawings shall be provided on the size
and media specified by NCS. The A/E shall provided a set of full size check
plots of all drawings, fully identified with path, drawing name, and attached
reference file along with a full size plot of any special project specific
symbology.
C. Ownership
A benchmark to test for adherence to delivery standards and format
compatibility should be performed on a sample of the work prior to final
delivery.
All CADD files created and reimbursed for this project shall be the property
of the Department of Veterans Affairs and National Cemetery System.
NCS CADD Standards Manual
August 1995
15