(1) Phasing Narrative.
(2) Phasing Diagram drawn on the Phasing Plan.
(3) Full size contract drawings for the CPM Phasing Plans (1 drawing may
reflect several reduced site plans)
(4) Written list of systems, including temporary system by phase, and
separated by technical discipline.
B. FINAL CONSTRUCTION DOCUMENTS
a. The A/E shall deliver the original Construction Documents to the Project
Manager for signature, after the previous review comments are incorporated and
the Construction Documents have been approved. The Construction Documents
shall bear the seal of the Registered Architect, Registered Landscape Architect,
and Professional Engineer responsible for the design.
b. Submit one complete set of mylars and CADD tapes of the project.